File #: ID#20-7757    Version: 1 Name: Approve design workorder for Lift Station 16 (20-0008-UT)
Type: Action Item Status: Passed
File created: 5/11/2020 In control: Public Works
On agenda: 6/4/2020 Final action: 6/4/2020
Title: Approve Engineer of Record (EOR) Work Order to Stantec Consulting Services, Inc., in the amount of $198,608 for design services for Lift Station 16 Rehabilitation on Pierce Street (20-0008-UT), and authorize the appropriation officials to execute same. (consent)
Indexes: **, 2. Economic & Housing Opportunity , 4. Environmental Stewardship
Attachments: 1. Stantec Work Order 20-0008-UT, 2. Location Map.pdf

SUBJECT/RECOMMENDATION:

Title

Approve Engineer of Record (EOR) Work Order to Stantec Consulting Services, Inc., in the amount of $198,608 for design services for Lift Station 16 Rehabilitation on Pierce Street (20-0008-UT), and authorize the appropriation officials to execute same. (consent)

Body

SUMMARY: 

Lift Station 16 components are at the end of useful life and in need of replacement/upgrades. Stantec will provide design, permitting, and bidding services associated with repair and replacement of old equipment in addition to raising the level of new electrical/mechanical equipment for improved resiliency. Also included is an evaluation and subsequent design of either a permanent generator or diesel pump to provide backup reliability in the event of an electrical power failure.

 

It is anticipated the design will be completed within approximately 7 months from the date of council approval.

 

The City of Clearwater Public Utilities Department is responsible for owning, operating, and maintaining the sanitary sewer collection system.

APPROPRIATION CODE AND AMOUNT:

3217321-561300-96686 $198,608

Funds are available in capital improvement project 96686, Pump Station Replacement, to fund this work order.