Approve Engineer of Record (EOR) Work Order to Stantec Consulting Services, Inc., in the amount of $198,608 for design services for Lift Station 16 Rehabilitation on Pierce Street (20-0008-UT), and authorize the appropriation officials to execute same. (consent)
Body
SUMMARY:
Lift Station 16 components are at the end of useful life and in need of replacement/upgrades. Stantec will provide design, permitting, and bidding services associated with repair and replacement of old equipment in addition to raising the level of new electrical/mechanical equipment for improved resiliency. Also included is an evaluation and subsequent design of either a permanent generator or diesel pump to provide backup reliability in the event of an electrical power failure.
It is anticipated the design will be completed within approximately 7 months from the date of council approval.
The City of Clearwater Public Utilities Department is responsible for owning, operating, and maintaining the sanitary sewer collection system.
APPROPRIATION CODE AND AMOUNT:
3217321-561300-96686 $198,608
Funds are available in capital improvement project 96686, Pump Station Replacement, to fund this work order.