Legislation Details

File #: ID#26-1142    Version: 1 Name: Approve a Professional Services Agreement and Work Order with American Infrastructure Development, Inc., of Tampa, FL., for the design of the Air Park Commercial Hangars project (23-0016-AP).
Type: Action Item Status: Agenda Ready
File created: 9/1/2026 In control: Public Works
On agenda: 11/30/2026 Final action:
Title: Approve a professional services agreement and work order with American Infrastructure Development, Inc., of Tampa, FL, for the design of the Air Park Commercial South Hangars project (23-0016-AP) in the amount of $513,111.80 pursuant to Request for Qualifications (RFQ) 44-26 and authorize the appropriate officials to execute same. (consent)
Attachments: 1. Project Map, 2. 44-26 - Design Professional Services Agreement, 3. Work Order, 4. RFQ 44-26 Solicitation, 5. Responses to RFQ, 6. Notice of Intent to Award, 7. Lease FLYUSA.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT/RECOMMENDATION:

Title

Approve a professional services agreement and work order with American Infrastructure Development, Inc., of Tampa, FL, for the design of the Air Park Commercial South Hangars project (23-0016-AP) in the amount of $513,111.80 pursuant to Request for Qualifications (RFQ) 44-26 and authorize the appropriate officials to execute same. (consent)

 

Body

SUMMARY: 

The City of Clearwater intends to engage American Infrastructure Development, Inc. (AID) to provide conceptual design, architectural design, engineering, and related professional services for the development of new Corporate Hangar facilities at the Clearwater Executive Airport, located at 1000 N. Hercules Avenue, Clearwater, Florida 33765.

On June 3, 2026, the City issued Request for Qualifications (RFQ) 44-26 for Design Services of New Corporate Hangars at Clearwater Executive Airport. Nine (9) firms submitted proposals. A selection committee comprised of representatives from the City's Public Works and Marine and Aviation Departments, along with a representative from FlyUSA, evaluated the proposals based on firm experience, personnel qualifications, project approach, and understanding of applicable regulatory requirements. American Infrastructure Development, Inc. (AID) was selected as the top-ranked firm based on its extensive experience in aviation facility and corporate hangar design, comprehensive architectural and engineering capabilities, and demonstrated understanding of airport operations, FAA requirements, and phased construction. The City's Notice of Intent to Award was issued on July 23, 2026.

The project area encompasses approximately 3.3 acres located within the existing shade hangar area near the southeast quadrant of the airport property (see attached project map). The three existing shade hangars, which are beyond their useful life, are anticipated to be demolished in conjunction with this project.

The project vision is to develop approximately 60,000 square feet of new Corporate Hangar facilities with ancillary office space, together with associated infrastructure improvements, including but not limited to asphalt apron areas, aircraft maneuvering and taxiing areas, surface parking, utility coordination, drainage improvements, lighting, landscaping, and related site improvements. The project may be constructed in multiple phases as funding becomes available, and the size and sequencing of each phase will be determined during the design process.

In accordance with the Lease and Operating Agreement between the City of Clearwater and FlyUSA, specifically article 12, the City and FlyUSA agreed in good faith to pursue FDOT funding for certain capital improvement projects including T-Hangers and Corporate Hangar facilities for the common purpose of repairing, redeveloping, and revitalizing the Clearwater Executive Airport. 

AID shall evaluate and develop conceptual design alternatives intended to maximize operational efficiency, aircraft maneuverability, site utilization, constructability, aesthetics, long-term flexibility, and overall functionality of the Airport facilities. The selected firm shall also recommend efficient and functional design approaches, including recommendations regarding building configuration. Efforts include complete design, permitting and bidding for a $13.5M construction budget. Construction administration services will be included under a future supplemental work order presented to council at time of construction contract approval.

The contract duration is 450 consecutive calendar days from the issuance of notice to proceed.

 

This project is funded at 80% by grant revenues from FDOT, and 20% by reimbursement revenue from FlyUSA, the Airport operator.

 

 

APPROPRIATION CODE AND AMOUNT:

3027302-563600-G2401 for $513,111.80

Funding is available in capital improvement project G2401, Airpark Hangars - New, to cover this work order. This project is funded at 80% by grant revenues from FDOT, and 20% by reimbursement revenue from the Airport operator, FlyUSA.

 

STRATEGIC PRIORITY:

High Performing Government  

1.2 Maintain public infrastructure, mobility systems, natural lands, environmental resources, and historic features through systematic management efforts.  

Economic & Housing Opportunity

2.1 Strengthen public-private initiatives that attract, develop, and retain diversified business sectors,

2.3 Promote Clearwater as a premier destination for entertainment, cultural experiences, tourism, and national sporting events.