Legislation Details

File #: ID#23-1616    Version: 1 Name: 23-0013-UT NE WRF Digester
Type: Action Item Status: Consent Agenda
File created: 12/22/2023 In control: Public Utilities
On agenda: 1/18/2024 Final action:
Title: Approve a Work Order and purchase order to Black and Veatch (B and V), of Tampa, FL for Engineering support for the Northeast Water Reclamation Facility Digester Cover Repair Project (23-0013-UT) in the amount of $178,000.00 pursuant to RFQ 34-23, EOR Consulting Services and authorize the appropriate officials to execute same. (consent)
Attachments: 1. 2. ID#23-1616 23-0013-UT Clearwater NEWRF Digester Repairs BV WO_2023-07-28_signed by BV, 2. 3. ID#23-1616 23-0013-UT NE WRF Digester Repairs Location Map, 3. 4. ID#23-1616 23-0013-UT Engineer of Choice Checklist

SUBJECT/RECOMMENDATION:

Title

Approve a Work Order and purchase order to Black and Veatch (B and V), of Tampa, FL for Engineering support for the Northeast Water Reclamation Facility Digester Cover Repair Project (23-0013-UT) in the amount of $178,000.00 pursuant to RFQ 34-23, EOR Consulting Services and authorize the appropriate officials to execute same. (consent)

Body

SUMMARY: 

The City utilizes an anaerobic digester at its Northeast (NE) Water Reclamation Facility (WRF) that converts organic matter into stabilized biosolids and methane (or biogas). The digester at NE WRF was releasing small amounts of methane into the atmosphere through suspected leaks in its floating cover. The methane produced by the digester is flammable and when mixed with air, can create explosive conditions.

The NE WRF digester has been temporarily stabilized by installing a flame arrestor and this work order for B&V will start the engineering design for permanent repairs.

The work order includes engineering design for repairs to the floating cover, locating digester valves for replacement, and recommending modifications to convert an aerobic digester for use while repairs on the anaerobic digester are being completed.  B&V is an EOR for the City approved by Council on July 20, 2023.

Black & Veatch was selected due to the ability of their professional personnel (project managers), past performance on the WRF Master Plan and the AWIA project and other high-profile projects. Black & Veatch has a lot of experience designing and supervising construction of Water Reclamation Facility projects. Their ability to deliver a quality product, meeting designated timelines, and doing it professionally sets them apart from the other firms. They have experience and understanding of our Water Reclamation Facilities.

APPROPRIATION CODE AND AMOUNT:

3277327-546900-96664

 

Funds are available in capital improvement project 327-96664, Water Pollution Control R&R, to fund this contract.

 

STRATEGIC PRIORITY:

In furtherance of the Council’s Strategic Plan to achieve High Performing Government by maintaining environmental resources through systematic management efforts, approval of a Work Order and purchase order to Black & Veatch is requested.  The project also aligns with the City’s strategic goals of Community Well-Being and Environmental Stewardship.