SUBJECT:
Title
FLD2025-10026: Flexible Development approval for the conversion to a medical clinic in the Institutional (I) District as a Comprehensive Infill Redevelopment Project for the property located at 375 Turner Street. The existing building does not exceed 35 feet in height and the modified parking lot includes 57 off-street parking spaces. Requested is flexibility for reduced off-street parking for the subject site based on a parking demand study and reduced interior landscaping and landscape buffers along the property lines through a Comprehensive Landscape Program. (Community Development Code Section 2-1204.A., Section 3-1401.C. and Sections 3-1202.D., E. and G., Article 4, Division 4) (Level Two Application)
Body
SUMMARY:
Case: FLD2025-10026 - 375 Turner St
Owner: 301 Turner St LLC, 375 Turner 1 LLC, and 375 Turner 2 LLC; First United Methodist Church of Clearwater Inc.
Applicant: Krikor Kassarjian, Gulf Coast Consulting Inc.; 13825 ICOT Blvd., Suite 605, Clearwater, FL 33760; phone: (727) 524-1818
Location: Northwest corner of Turner Street and Palm Avenue (modified parking lot) and east side of Oak Avenue, south side of Turner Street and west side of S. Ft. Harrison Avenue. (2.57 acres)
Request: Flexible Development approval for the conversion to a medical clinic in the Institutional (I) District as a Comprehensive Infill Redevelopment Project for the property located at 375 Turner Street. The existing building does not exceed 35 feet in height and the modified parking lot includes 57 off-street parking spaces. Requested is flexibility for reduced off-street parking for the subject site based on a parking demand study and reduced interior landscaping and landscape buffers along the property lines through a Comprehensive Landscape Program. (Community Development Code Section 2-1204.A., Section 3-1401.C. and Sections 3-1202.D., E. and G., Article 4, Division 4)
Associations: Board of County Commissioners, Clearwater Neighborhood Coalition, Pinellas County School Board
Assigned Planner: Ava Schmidt; Planner II; email: Ava.Schmidt@myclearwater.com; phone: 727-444-8028
The application, supporting documents, and a complete plan set are attached to this agenda item. The staff report will be attached by the close of the business day on the Thursday prior the CDB.